Daily Staff Journal 28-Feb-67 |
Daily Staff Journals maintained by 1st Brigade
Thanks to Matt Vuolo for obtaining and sharing this report.
1st Brigade S2-S3 Daily Action reported to Brigade HQ 2/14 Bn S-3 Unit Action reported to 2/14 Battalion HQ
2/14th, S-3
Location: Dau Tieng, Vietnam
0001-2400 28-Feb-67
ITEM`
TIME
INCIDENTS, MESSAGES, ORDERS, ETC.
Initial log entries contain hourly sit/rep, no change. 25
1700
C Co progress report: Bunker #6 rebuilt. B Co mess hall one wall built. 400 sand bags filled.
Rest of day patrols come and go, no action.
1st Brigade, S2-S3
Location: Cu Chi, Vietnam
0001-2400 28-Feb-67
ITEM`
TIME
INCIDENTS, MESSAGES, ORDERS, ETC.
4
0045
A/4/9 patrol spotted 10 VC at XT620159, calling Arty on their position.
7
0201
4/9 lost commo with patrol from A Co. The patrol returning to new Laterite pit vic XT620168 to remain until morning.
10 0450 4/9 Bn reported spotting 10 personnel vic new Laterite pit. Engaged with SA fire; results unk at this time. 11 0508 4/9 Laterite pit observed 30 personnel vix XT672146 carrying torches and building fires. Continuing to observe. 15 1100 Sub Sector advisor at Phu Hoa Duong reported a possible 10 VC outpost vic XT707188. 19 1902 A/3/4 Cav will be closing Cu Chi in approx 30 min, B/3/4 Cav is in rear of column. 21 1930 2/14 REDOPS and 4/9 OPORD 9-67. 23 2030 4/9 observed ARVN soldier and civilian near vic old Laterite pit trying to cut through the wire, appears they want to get to sanitary fill. 4/9 is giving them warning not to do so. 24 2045 A/4/9 security patrol at New Laterite Pit observed 3 VC XT625156, taken under fire at the same time the 2/27 opened up with .50 Cal on bunker line. Results unk. 31 2400 SUMMARY: 1st Bde w/two Bns (4/9 and 4/23 (M) continued security opns vic the Cu Chi base. 4/23 (M) came under OPCON 1st Bde 271430 hrs. 4/23 closing Cu Chi base, conducted security opns and maintenance 28 Feb 67. 4/9 Inf continued security opns vic the Cu Chi base and provided one Co as Div Base Reaction Force, with Co B. Co A provided one platoon for security of new Laterite pit. Co C one platoon conducted security opns vic Cu Chi base and secured the new Laterite pit.
PLANS SUMMARY: 1st Bde will continue to control the defense of the Cu Chi base perimeter. 4/23 Inf will conduct security opns vic the Cu Chi base. 4/9 Inf will continue security opns vic the Cu Chi base.
2nd Battalion, 14th Infantry Regiment: Daily Staff Journals
Copyright © 2008 Kirk S. Ramsey
Last modified: March 26, 2008